{
  "dataset": "Alberta Data Centre Map",
  "lastUpdated": "June 1, 2025",
  "note": "This export includes selected fields from the Alberta Data Centre Map dataset. It is intended for research, reporting, civic discussion, and source review. Unknown means no public source has been found or added yet for that field — it does not imply wrongdoing, non-compliance, or concealment. Context-only fields (nearby water bodies, nearby communities) are excluded from this export. Please read the methodology before interpreting or republishing this data.",
  "methodologyUrl": "/methodology",
  "dataGapsUrl": "/data-gaps",
  "records": [
    {
      "id": "estruxture-cal3",
      "name": "eStruxture CAL-3",
      "location": "Rocky View County, AB (Balzac area)",
      "municipality": "Rocky View County",
      "latitude": 51.18,
      "longitude": -114,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "Colocation / Cloud",
      "source_status": "Source-listed",
      "purpose": "Tier III designed colocation data centre; 90 MW; up to 125 kW+ per cabinet; hot aisle/cold aisle containment",
      "power_mw": 90,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Redundant cooling with hot aisle/cold aisle containment",
      "permanent_jobs": "Unknown",
      "construction_jobs": "Unknown",
      "developer": "eStruxture Networks",
      "operator": "eStruxture Networks",
      "end_user": null,
      "project_cost_cad": null,
      "expected_operational_date": "Fall 2026 (operator-scheduled)",
      "last_updated": "2026-06-10",
      "public_sources_count": 2,
      "public_source_names": [
        "eStruxture Networks — CAL-3 data centre page",
        "eStruxture Networks — Calgary data centres overview"
      ],
      "public_source_urls": [
        "https://www.estruxture.com/data-centers/calgary/cal-3",
        "https://www.estruxture.com/data-centers/calgary/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=estruxture-cal3"
    },
    {
      "id": "synapse-olds",
      "name": "Synapse Olds Data Centre",
      "location": "Olds, AB",
      "municipality": "Olds",
      "latitude": 51.796,
      "longitude": -114.109,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "AI / HPC",
      "source_status": "Source-listed",
      "purpose": "AI data centre campus; 2 million sq ft; described as designed for Fortune 10-level GPU requirements",
      "power_mw": 1000,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": "1,000+",
      "construction_jobs": 2000,
      "developer": "Synapse Data Center Inc.",
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": "$10 billion CAD",
      "expected_operational_date": null,
      "last_updated": "2026-06-10",
      "public_sources_count": 3,
      "public_source_names": [
        "Alberta Major Projects — Synapse Olds Data Centre",
        "Synapse Data Center Inc. — project website",
        "AUC Proceeding 30732 — Synapse Olds power plant application"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Synapse-Olds-Data-Centre/12013",
        "https://synapsedatacenter.com/",
        "https://www.auc.ab.ca/featured/synapse-data-center-power-plant-project/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Approximate location"
      ],
      "map_url": "/?project=synapse-olds"
    },
    {
      "id": "wonder-valley",
      "name": "Wonder Valley AI Data Centre Park",
      "location": "Greenview Industrial Gateway, Greenview No. 16, AB",
      "municipality": "Greenview No. 16",
      "latitude": 55.08,
      "longitude": -117.28,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "AI / HPC",
      "source_status": "Source-listed",
      "purpose": "AI data centre industrial park — Phase 1 off-grid power infrastructure using Alberta natural gas and geothermal resources; described as foundational for world's largest AI data centre industrial park",
      "power_mw": 1400,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": "Unknown",
      "construction_jobs": "Unknown",
      "developer": "O'Leary Ventures",
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": "$12 billion CAD (Phase 1; reported)",
      "expected_operational_date": null,
      "last_updated": "2026-06-10",
      "public_sources_count": 2,
      "public_source_names": [
        "Alberta Major Projects — Wonder Valley AI Data Centre Park",
        "O'Leary Ventures — Wonder Valley project page"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Wonder-Valley-AI-Data-Centre-Park/11477",
        "https://olearyventures.com/wondervalley/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=wonder-valley"
    },
    {
      "id": "crusoe-brazeau",
      "name": "Crusoe AI Data Centre — Myers Energy Park (Brazeau County)",
      "location": "Brazeau County, AB (Myers Energy Park)",
      "municipality": "Brazeau County",
      "latitude": 52.98,
      "longitude": -115.15,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "AI / HPC",
      "source_status": "Source-listed",
      "purpose": "AI data centre co-located with 170 MW natural gas power plant (Kalina Distributed Power); Myers Energy Park, Brazeau County; one of three Crusoe-Kalina sites",
      "power_mw": 170,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Crusoe AI (in partnership with Kalina Distributed Power)",
      "operator": "Crusoe AI",
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-10",
      "public_sources_count": 2,
      "public_source_names": [
        "Alberta Major Projects — Crusoe AI Data Centres Alberta (AMP #11556)",
        "Data Centre Dynamics — Crusoe, Kalina partner for Alberta AI data centres"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Crusoe-AI-Datacenters-Alberta/11556",
        "https://www.datacenterdynamics.com/en/news/crusoe-kalina-partner-to-develop-natural-gas-powered-ai-data-centers-in-alberta-canada/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=crusoe-brazeau"
    },
    {
      "id": "crusoe-red-deer-county",
      "name": "Crusoe AI Data Centre — Red Deer County (Alsike Energy Park)",
      "location": "Red Deer County, AB (Alsike Energy Park)",
      "municipality": "Red Deer County",
      "latitude": 52.03,
      "longitude": -113.95,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "AI / HPC",
      "source_status": "Source-listed",
      "purpose": "AI data centre co-located with 170 MW natural gas power plant (Kalina Distributed Power); Alsike Energy Park, 160-acre site",
      "power_mw": 170,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Crusoe AI (in partnership with Kalina Distributed Power)",
      "operator": "Crusoe AI",
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-10",
      "public_sources_count": 2,
      "public_source_names": [
        "Alberta Major Projects — Crusoe AI Data Centres Alberta (AMP #11556)",
        "Data Centre Dynamics — Crusoe, Kalina partner for Alberta AI data centres"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Crusoe-AI-Datacenters-Alberta/11556",
        "https://www.datacenterdynamics.com/en/news/crusoe-kalina-partner-to-develop-natural-gas-powered-ai-data-centers-in-alberta-canada/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=crusoe-red-deer-county"
    },
    {
      "id": "crusoe-rocky-view",
      "name": "Crusoe AI Data Centre — Rocky View County (Crossfield Energy Park)",
      "location": "Rocky View County, AB (Crossfield Energy Park)",
      "municipality": "Rocky View County",
      "latitude": 51.28,
      "longitude": -114.2,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "AI / HPC",
      "source_status": "Source-listed",
      "purpose": "AI data centre co-located with 170 MW natural gas power plant (Kalina Distributed Power); Crossfield Energy Park, 320-acre site",
      "power_mw": 170,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Crusoe AI (in partnership with Kalina Distributed Power)",
      "operator": "Crusoe AI",
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-10",
      "public_sources_count": 2,
      "public_source_names": [
        "Alberta Major Projects — Crusoe AI Data Centres Alberta (AMP #11556)",
        "Data Centre Dynamics — Crusoe, Kalina partner for Alberta AI data centres"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Crusoe-AI-Datacenters-Alberta/11556",
        "https://www.datacenterdynamics.com/en/news/crusoe-kalina-partner-to-develop-natural-gas-powered-ai-data-centers-in-alberta-canada/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=crusoe-rocky-view"
    },
    {
      "id": "prairie-sky-strathmore",
      "name": "Prairie Sky Data Solutions Strathmore Data Center (Phase 1)",
      "location": "Strathmore, AB",
      "municipality": "Strathmore",
      "latitude": 51.035,
      "longitude": -113.4,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "Colocation / Cloud",
      "source_status": "Source-listed",
      "purpose": "AI-compatible colocation data centre; retrofit of former cannabis manufacturing facility; Phase 1 of a planned 50 MW campus",
      "power_mw": null,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Prairie Sky Data Solutions",
      "operator": "Prairie Sky Data Solutions",
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": "2026",
      "last_updated": "2026-06-09",
      "public_sources_count": 3,
      "public_source_names": [
        "Alberta Major Projects — Prairie Sky Data Solutions Strathmore Data Center (Phase 1)",
        "Strathmore Times — Prairie Sky Data Solutions prepares to launch local AI data center",
        "Prairie Sky Data Solutions — company website"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Prairie-Sky-Data-Solutions-Strathmore-Data-Center-Phase-1/11820",
        "https://strathmoretimes.com/2025/prairie-sky-data-solutions-prepares-to-launch-local-ai-data-center/",
        "https://www.prairieskydata.com/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=prairie-sky-strathmore"
    },
    {
      "id": "mihta-askiy",
      "name": "Mihta Askiy Data Centre",
      "location": "Northern Sunrise County, AB (40 km NE of Peace River)",
      "municipality": "Northern Sunrise County",
      "latitude": 56.37,
      "longitude": -116.9,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "Mixed / Unknown",
      "source_status": "Publicly sourced",
      "purpose": "Natural gas-powered data centre on repurposed Carmon Creek power plant site; Woodland Cree First Nation led; two 200 MW Siemens turbines procured",
      "power_mw": 650,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Mihta Askiy Datacenter LP (Cree Ative Datacenter Corp GP, subsidiary of Sovereign Digital Infrastructure)",
      "operator": "Mihta Askiy Datacenter LP",
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": "2027",
      "last_updated": "2026-06-10",
      "public_sources_count": 3,
      "public_source_names": [
        "Alberta Major Projects — Mihta Askiy Data Centre (AMP #12097)",
        "CBC News — Indigenous-led data centre in Alberta slated for development",
        "Impact Assessment Agency of Canada — Mihta Askiy Data Center Project"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Mihta-Askiy-Data-Centre/12097",
        "https://www.cbc.ca/news/canada/edmonton/first-indigenous-data-centre-abandoned-power-plant-1.7586072",
        "https://iaac-aeic.gc.ca/050/evaluations/proj/90036"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=mihta-askiy"
    },
    {
      "id": "clive-dc",
      "name": "Data Centre — West of Clive",
      "location": "Lacombe County, AB (west of Clive, off Haynes Road)",
      "municipality": "Lacombe County",
      "latitude": 52.444,
      "longitude": -113.545,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "Mixed / Unknown",
      "source_status": "Source-listed",
      "purpose": "Natural gas-fired compute facility with biofuel capability; modular data processing containers for AI, cryptocurrency mining, and other intensive workloads; 4.3-acre site",
      "power_mw": 19.8,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "VL Energy and Amada Nowlitt Energy",
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-09",
      "public_sources_count": 1,
      "public_source_names": [
        "Alberta Major Projects — Data Center (Clive) (AMP #12068)"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Data-Center-Clive/12068"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=clive-dc"
    },
    {
      "id": "beacon-foothills",
      "name": "Beacon Foothills AI Data Center Hub",
      "location": "Foothills No. 31, AB",
      "municipality": "Foothills No. 31",
      "latitude": 50.596856,
      "longitude": -113.825467,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "AI / HPC",
      "source_status": "Source-listed",
      "purpose": "AI data centre campus; two five-storey buildings; on-site power generation; one of three Beacon Calgary-area campuses",
      "power_mw": 400,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": 300,
      "construction_jobs": null,
      "developer": "Beacon Data Centers",
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": "$4 billion CAD",
      "expected_operational_date": null,
      "last_updated": "2026-06-09",
      "public_sources_count": 2,
      "public_source_names": [
        "Alberta Major Projects — Beacon Foothills AI Data Center Hub",
        "Beacon Data Centers — company website"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Beacon-Foothills-AI-Data-Center-Hub/12110",
        "https://beacondatacenters.com/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Approximate location"
      ],
      "map_url": "/?project=beacon-foothills"
    },
    {
      "id": "beacon-indus",
      "name": "Beacon Indus Data Center Hub",
      "location": "Indus, Rocky View County, AB",
      "municipality": "Rocky View County",
      "latitude": 50.99,
      "longitude": -113.87,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "AI / HPC",
      "source_status": "Source-listed",
      "purpose": "AI data centre campus; Indus Power Generation LP; 1,494 MWe; one of three Beacon Calgary-area campuses",
      "power_mw": 1494,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Beacon Data Centers (Indus Power Generation LP, by general partner Northbridge Power GPC Inc.)",
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-10",
      "public_sources_count": 3,
      "public_source_names": [
        "Alberta Major Projects — Beacon Indus Data Center Hub",
        "Beacon Data Centers — Indus CGY FAQ",
        "AUC Proceeding 30524 — Beacon AI Centers Indus Project Thermal Power Plant"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Beacon-Indus-Data-Center-Hub/12111",
        "https://beacondatacenters.com/wp-content/uploads/2026/02/BEA_IndusCGY-FAQ.pdf",
        "https://www.auc.ab.ca/featured/beacon-ai-centers-indus-project-thermal-power-plant/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=beacon-indus"
    },
    {
      "id": "beacon-heartland",
      "name": "Beacon Heartland AI Data Center Hub",
      "location": "Sturgeon County, AB",
      "municipality": "Sturgeon County",
      "latitude": 53.67,
      "longitude": -113.21,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "AI / HPC",
      "source_status": "Source-listed",
      "purpose": "AI data centre campus; one of three Beacon Edmonton-region campuses; per-campus power capacity not publicly confirmed",
      "power_mw": null,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Beacon Data Centers",
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": "2027",
      "last_updated": "2026-06-10",
      "public_sources_count": 2,
      "public_source_names": [
        "Alberta Major Projects — Beacon Heartland AI Data Center Hub",
        "Beacon Data Centers — company website"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Beacon-Heartland-AI-Data-Center-Hub/12112",
        "https://beacondatacenters.com/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=beacon-heartland"
    },
    {
      "id": "beacon-chestermere",
      "name": "Beacon Chestermere AI Data Center Hub",
      "location": "Chestermere, AB (southern area)",
      "municipality": "Chestermere",
      "latitude": 51.048,
      "longitude": -113.816,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "AI / HPC",
      "source_status": "Source-listed",
      "purpose": "AI data centre campus; 310-acre greenfield site in southern Chestermere; one of three Beacon Calgary-area campuses",
      "power_mw": 400,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Beacon Data Centers",
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": "2027",
      "last_updated": "2026-06-09",
      "public_sources_count": 2,
      "public_source_names": [
        "Alberta Major Projects — Beacon Chestermere AI Data Center Hub",
        "Beacon Data Centers — company website"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Beacon-Chestermere-AI-Data-Center-Hub/12113",
        "https://beacondatacenters.com/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=beacon-chestermere"
    },
    {
      "id": "estruxture-cal1",
      "name": "eStruxture CAL-1",
      "location": "Calgary, AB",
      "municipality": "Calgary",
      "latitude": 50.992261,
      "longitude": -113.95566,
      "location_approximate": false,
      "status": "Operating",
      "workload_type": "Colocation / Cloud",
      "source_status": "Publicly sourced",
      "purpose": "Tier III colocation data centre; Phase 4 alterations underway",
      "power_mw": 9,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Hot aisle/cold aisle containment (air cooling)",
      "permanent_jobs": "Unknown",
      "construction_jobs": null,
      "developer": "eStruxture Networks",
      "operator": "eStruxture Networks",
      "end_user": "Multiple colocation tenants",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-09",
      "public_sources_count": 3,
      "public_source_names": [
        "Alberta Major Projects — eStruxture CAL-1 Phase 4 Alterations",
        "eStruxture Networks — CAL-1 data centre page",
        "Data Center Hawk — eStruxture CAL-1"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/eStruxtue-CAL-1-Data-Centre-Phase-4-Alterations/11866",
        "https://www.estruxture.com/data-centers/calgary/cal-1",
        "https://www.datacenterhawk.com/colo/estruxture/7007-54-street-se/cal-1"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown permanent jobs"
      ],
      "map_url": "/?project=estruxture-cal1"
    },
    {
      "id": "beacon-harry-smith",
      "name": "Beacon Harry Smith AI Data Center Hub",
      "location": "Parkland County, AB",
      "municipality": "Parkland County",
      "latitude": 53.44,
      "longitude": -114.1,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "AI / HPC",
      "source_status": "Source-listed",
      "purpose": "AI data centre hub — one of three Edmonton-region Beacon campuses",
      "power_mw": null,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Beacon Data Centers",
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-09",
      "public_sources_count": 1,
      "public_source_names": [
        "Alberta Major Projects — Beacon Harry Smith AI Data Center Hub"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Beacon-Harry-Smith-AI-Data-Center-Hub/11800"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=beacon-harry-smith"
    },
    {
      "id": "beacon-saunders-lake",
      "name": "Beacon Saunders Lake AI Data Center Hub",
      "location": "Leduc County, AB",
      "municipality": "Leduc County",
      "latitude": 53.22,
      "longitude": -113.55,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "AI / HPC",
      "source_status": "Source-listed",
      "purpose": "AI data centre hub — one of three Edmonton-region Beacon campuses",
      "power_mw": null,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Beacon Data Centers",
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-09",
      "public_sources_count": 1,
      "public_source_names": [
        "Alberta Major Projects — Beacon Saunders Lake AI Data Center Hub"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Beacon-Saunders-Lake-AI-Data-Center-Hub/11799"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=beacon-saunders-lake"
    },
    {
      "id": "hubone-wheatland",
      "name": "HubOne AI & BTC High Density Compute Park",
      "location": "Wheatland County, AB",
      "municipality": "Wheatland County",
      "latitude": 51.017296,
      "longitude": -113.528123,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "Mixed / Unknown",
      "source_status": "Source-listed",
      "purpose": "AI high-performance compute and high-density immersion BTC mining campus; up to 15 private AI data facilities proposed; aspirational 3,000 MW on-site power capacity",
      "power_mw": null,
      "power_label": "Up to 3,000 MW (aspirational campus capacity — not confirmed)",
      "water_source": "Unknown",
      "cooling_method": "High-density immersion cooling (BTC mining component); AI facilities unspecified",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Elemental Developments & Hub1 Joint Venture Partnership",
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-10",
      "public_sources_count": 2,
      "public_source_names": [
        "Alberta Major Projects — HubOne AI & BTC High Density Compute Park",
        "HubOne — company website"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/HubOne-AI-BTC-High-Density-Compute-Park/11638",
        "https://hub1.ca/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=hubone-wheatland"
    },
    {
      "id": "blindman-industrial-dc",
      "name": "Blindman Industrial Park AI Data Centre",
      "location": "Red Deer County, AB (Blindman Industrial Park)",
      "municipality": "Red Deer County",
      "latitude": 52.3,
      "longitude": -113.75,
      "location_approximate": true,
      "status": "Under Construction",
      "workload_type": "AI / HPC",
      "source_status": "Source-listed",
      "purpose": "Waterless, ultra-low noise AI data centre with dedicated heat and power plant",
      "power_mw": null,
      "power_label": null,
      "water_source": "None — waterless design, no water-based cooling",
      "cooling_method": "Air cooling (waterless, ultra-low noise design)",
      "permanent_jobs": "5–7",
      "construction_jobs": null,
      "developer": "Havenz Smart Communities",
      "operator": "Havenz Smart Communities",
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": "2026",
      "last_updated": "2026-06-09",
      "public_sources_count": 3,
      "public_source_names": [
        "Alberta Major Projects — Blindman Industrial Park AI Data Centre",
        "Red Deer Advocate — Red Deer County approves data centre",
        "RD News Now — Construction accelerates at AI data centre near Red Deer"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Blindman-Industrial-Park-AI-Data-Centre/11890",
        "https://reddeeradvocate.com/2025/10/07/red-deer-county-approves-data-centre/",
        "https://rdnewsnow.com/2026/01/26/construction-accelerates-at-ai-data-centre-near-red-deer/"
      ],
      "data_gaps": [
        "Approximate location"
      ],
      "map_url": "/?project=blindman-industrial-dc"
    },
    {
      "id": "tne-data-district-phase1",
      "name": "TNE & Data District Data Centres — Phase 1",
      "location": "Multiple Alberta regions: Olds, Calgary, Edmonton, Bonnyville",
      "municipality": "Mountain View County / Multiple regions",
      "latitude": 51.81,
      "longitude": -114.11,
      "location_approximate": true,
      "status": "Proposed / Announced",
      "workload_type": "AI / HPC",
      "source_status": "Source-listed",
      "purpose": "AI-ready data centre portfolio — four facilities across Alberta (Phase 1 of a larger 1 GW+ pipeline)",
      "power_mw": 240,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Technologies New Energy (TNE) & Data District Inc.",
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": "$1.3 billion CAD (Phase 1; reported)",
      "expected_operational_date": null,
      "last_updated": "2026-06-10",
      "public_sources_count": 3,
      "public_source_names": [
        "Alberta Major Projects — TNE & Data District Data Centres Phase 1",
        "Data Centre Dynamics — TNE partners with Data District for 1 GW Alberta pipeline",
        "Connect CRE Canada — TNE & Data District: four data centres in Alberta"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Technologies-New-Energy-Data-District-Data-Centres-Phase-1/11969",
        "https://www.datacenterdynamics.com/en/news/tne-partners-with-data-district-to-support-1gw-data-center-pipeline-in-alberta-canada/",
        "https://www.connectcre.ca/stories/tne-data-district-to-develop-four-new-data-centres-in-alberta/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=tne-data-district-phase1"
    },
    {
      "id": "equinix-cl3-calgary",
      "name": "Equinix Calgary Data Center CL3",
      "location": "Calgary, AB (86 Avenue SE)",
      "municipality": "Calgary",
      "latitude": 50.976971,
      "longitude": -113.956677,
      "location_approximate": false,
      "status": "Operating",
      "workload_type": "Colocation / Cloud",
      "source_status": "Publicly sourced",
      "purpose": "Carrier-neutral colocation data centre; 42,882 sq ft; 14 connected networks",
      "power_mw": 1.5,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Equinix",
      "operator": "Equinix",
      "end_user": "Unknown (colocation clients)",
      "project_cost_cad": "$24 million CAD (2022–2023 alterations)",
      "expected_operational_date": "2023",
      "last_updated": "2026-06-09",
      "public_sources_count": 2,
      "public_source_names": [
        "PeeringDB — Equinix CL3 Calgary (ID 3251)",
        "Alberta Major Projects — Equinix Calgary Data Center CL3 Interior/Exterior Alterations"
      ],
      "public_source_urls": [
        "https://www.peeringdb.com/fac/3251",
        "https://majorprojects.alberta.ca/details/Equinix-Calgary-Data-Center-CL3-Interior-Exterior-Alterations/10530"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs"
      ],
      "map_url": "/?project=equinix-cl3-calgary"
    },
    {
      "id": "whitehorn-it-calgary",
      "name": "Whitehorn IT Data Center",
      "location": "Calgary, AB",
      "municipality": "Calgary",
      "latitude": 51.085904,
      "longitude": -113.983785,
      "location_approximate": true,
      "status": "Unknown / Unclear",
      "workload_type": "Traditional Enterprise",
      "source_status": "Source-listed",
      "purpose": "Municipal data facility — renovation of existing facility and construction of Tier III data centre",
      "power_mw": null,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "City of Calgary",
      "operator": "City of Calgary",
      "end_user": "City of Calgary",
      "project_cost_cad": "$7.6 million CAD",
      "expected_operational_date": "2018",
      "last_updated": "2026-06-10",
      "public_sources_count": 1,
      "public_source_names": [
        "Alberta Major Projects — Whitehorn IT Data Center"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Whitehorn-IT-Data-Center"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=whitehorn-it-calgary"
    },
    {
      "id": "bitdeer-fox-creek",
      "name": "Bitdeer Crypto Mining Facility Fox Creek",
      "location": "Fox Creek, AB (MD of Greenview No. 16)",
      "municipality": "Fox Creek / MD of Greenview No. 16",
      "latitude": 54.4,
      "longitude": -116.79,
      "location_approximate": true,
      "status": "Under Construction",
      "workload_type": "Crypto / High Density",
      "source_status": "Source-listed",
      "purpose": "Crypto mining facility with on-site natural gas power generation; future AI/HPC expansion planned",
      "power_mw": 100,
      "power_label": null,
      "water_source": "None — closed-loop dry cooling system, no water intake",
      "cooling_method": "Closed-loop dry cooling",
      "permanent_jobs": 30,
      "construction_jobs": 300,
      "developer": "Bitdeer Technologies Group",
      "operator": "Bitdeer Technologies Group",
      "end_user": "Bitdeer (proprietary Bitcoin mining)",
      "project_cost_cad": "$214 million CAD",
      "expected_operational_date": "2027",
      "last_updated": "2026-06-10",
      "public_sources_count": 2,
      "public_source_names": [
        "Alberta Major Projects — Bitdeer Crypto Mining Facility Fox Creek",
        "Bitdeer — Fox Creek data centre page"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Bitdeer-Crypto-Mining-Facility-Fox-Creek/11568",
        "https://www.bitdeer.com/datacenter/fox-creek"
      ],
      "data_gaps": [
        "Approximate location"
      ],
      "map_url": "/?project=bitdeer-fox-creek"
    },
    {
      "id": "medicine-hat-crypto-mine",
      "name": "Medicine Hat Cryptocurrency Mine",
      "location": "Medicine Hat, AB",
      "municipality": "Medicine Hat",
      "latitude": 50.0924,
      "longitude": -110.7321,
      "location_approximate": true,
      "status": "Unknown / Unclear",
      "workload_type": "Crypto / High Density",
      "source_status": "Source-listed",
      "purpose": "Cryptocurrency mining operation using power from Medicine Hat Unit 16 gas-fired power plant",
      "power_mw": 42,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Hut 8",
      "operator": "Hut 8",
      "end_user": "Hut 8 (proprietary Bitcoin mining)",
      "project_cost_cad": "$100 million CAD",
      "expected_operational_date": "2018",
      "last_updated": "2026-06-10",
      "public_sources_count": 1,
      "public_source_names": [
        "Alberta Major Projects — Medicine Hat Cryptocurrency Mine"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Medicine-Hat-Cryptocurrency-Mine"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=medicine-hat-crypto-mine"
    },
    {
      "id": "gryphon-pincher-creek",
      "name": "Gryphon Digital Alberta AI and Data Center",
      "location": "Near Pincher Creek, AB",
      "municipality": "Pincher Creek",
      "latitude": 49.49,
      "longitude": -113.95,
      "location_approximate": true,
      "status": "Unknown / Unclear",
      "workload_type": "AI / HPC",
      "source_status": "Needs source review",
      "purpose": "AI and high-performance computing data centre infrastructure on former Captus Energy industrial site",
      "power_mw": 130,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Gryphon Digital Mining",
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-10",
      "public_sources_count": 1,
      "public_source_names": [
        "Alberta Major Projects — Gryphon Digital Alberta AI and Data Center (ID 11518)"
      ],
      "public_source_urls": [
        "https://majorprojects.alberta.ca/details/Gryphon-Digital-Alberta-AI-and-Data-Center/11518"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location",
        "Needs source review"
      ],
      "map_url": "/?project=gryphon-pincher-creek"
    },
    {
      "id": "keephills-dc-phase1",
      "name": "Keephills Data Centre Phase I",
      "location": "Keephills, Parkland County, AB",
      "municipality": "Parkland County",
      "latitude": 53.47,
      "longitude": -114.6,
      "location_approximate": true,
      "status": "MOU / Early Agreement",
      "workload_type": "Mixed / Unknown",
      "source_status": "Source-listed",
      "purpose": "Data centre — Keephills industrial site",
      "power_mw": 230,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": null,
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-10",
      "public_sources_count": 2,
      "public_source_names": [
        "AESO Large Load Projects — P3083 Keephills Data Centre Phase I",
        "TransAlta — MOU announcement for data centre at Keephills"
      ],
      "public_source_urls": [
        "https://www.aeso.ca/grid/connecting-to-the-grid/large-load-projects/",
        "https://transalta.com/newsroom/transalta-enters-memorandum-of-understanding-for-data-centre-development-at-keephills-site-with-potential-to-scale-up-to-1-gw/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=keephills-dc-phase1"
    },
    {
      "id": "gldc-load",
      "name": "GLDC Load",
      "location": "Alberta (location not publicly confirmed)",
      "municipality": "Alberta (unknown)",
      "latitude": 53.5,
      "longitude": -114,
      "location_approximate": true,
      "status": "Unknown / Unclear",
      "workload_type": "Mixed / Unknown",
      "source_status": "Source-listed",
      "purpose": "Data centre load — AESO grid connection record",
      "power_mw": 970,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": null,
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-10",
      "public_sources_count": 2,
      "public_source_names": [
        "AESO Large Load Projects — P2936 GLDC Load",
        "Context note — Greenlight Electricity & Data Centre Complex (Pembina / Kineticor)"
      ],
      "public_source_urls": [
        "https://www.aeso.ca/grid/connecting-to-the-grid/large-load-projects/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location",
        "Needs source review"
      ],
      "map_url": "/?project=gldc-load"
    },
    {
      "id": "estruxture-cal2",
      "name": "eStruxture CAL-2",
      "location": "Rocky View County, AB (Balzac area)",
      "municipality": "Rocky View County",
      "latitude": 51.17,
      "longitude": -113.99,
      "location_approximate": true,
      "status": "Operating",
      "workload_type": "Colocation / Cloud",
      "source_status": "Publicly sourced",
      "purpose": "Tier III designed colocation data centre; 106,000 sq ft, up to 20 kW per cabinet",
      "power_mw": 26,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": "Unknown",
      "construction_jobs": null,
      "developer": "eStruxture Networks",
      "operator": "eStruxture Networks",
      "end_user": "Multiple colocation tenants",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-09",
      "public_sources_count": 2,
      "public_source_names": [
        "eStruxture Networks — CAL-2 data centre page",
        "eStruxture Networks — Calgary data centres overview"
      ],
      "public_source_urls": [
        "https://www.estruxture.com/data-centers/calgary/cal-2",
        "https://www.estruxture.com/data-centers/calgary/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=estruxture-cal2"
    },
    {
      "id": "equinix-cl1-calgary",
      "name": "Equinix Calgary CL1",
      "location": "Calgary, AB (Downtown)",
      "municipality": "Calgary",
      "latitude": 51.045517,
      "longitude": -114.069297,
      "location_approximate": false,
      "status": "Operating",
      "workload_type": "Colocation / Cloud",
      "source_status": "Publicly sourced",
      "purpose": "Colocation data centre",
      "power_mw": null,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": "Unknown",
      "construction_jobs": null,
      "developer": "Equinix",
      "operator": "Equinix",
      "end_user": "Unknown (colocation clients)",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-09",
      "public_sources_count": 1,
      "public_source_names": [
        "PeeringDB — Equinix Calgary CL1 (ID 9553)"
      ],
      "public_source_urls": [
        "https://www.peeringdb.com/fac/9553"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs"
      ],
      "map_url": "/?project=equinix-cl1-calgary"
    },
    {
      "id": "equinix-cl2-calgary",
      "name": "Equinix Calgary CL2",
      "location": "Calgary, AB (Maynard Road SE)",
      "municipality": "Calgary",
      "latitude": 51.048066,
      "longitude": -114.009688,
      "location_approximate": false,
      "status": "Operating",
      "workload_type": "Colocation / Cloud",
      "source_status": "Publicly sourced",
      "purpose": "Colocation data centre",
      "power_mw": null,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": "Unknown",
      "construction_jobs": null,
      "developer": "Equinix",
      "operator": "Equinix",
      "end_user": "Unknown (colocation clients)",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-09",
      "public_sources_count": 1,
      "public_source_names": [
        "PeeringDB — Equinix Calgary CL2 (ID 9554)"
      ],
      "public_source_urls": [
        "https://www.peeringdb.com/fac/9554"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs"
      ],
      "map_url": "/?project=equinix-cl2-calgary"
    },
    {
      "id": "cologix-cgy1",
      "name": "Cologix CGY1",
      "location": "Calgary, AB (Downtown)",
      "municipality": "Calgary",
      "latitude": 51.047276,
      "longitude": -114.080824,
      "location_approximate": false,
      "status": "Operating",
      "workload_type": "Colocation / Cloud",
      "source_status": "Publicly sourced",
      "purpose": "Network-neutral colocation data centre; YYCIX (Calgary Internet Exchange) access point",
      "power_mw": 0.4,
      "power_label": "400 kW",
      "water_source": "Unknown",
      "cooling_method": "N+1 cooling",
      "permanent_jobs": "Unknown",
      "construction_jobs": null,
      "developer": "Cologix",
      "operator": "Cologix",
      "end_user": "Multiple colocation tenants",
      "project_cost_cad": null,
      "expected_operational_date": null,
      "last_updated": "2026-06-09",
      "public_sources_count": 2,
      "public_source_names": [
        "Cologix — CGY1 Calgary data centre page",
        "PeeringDB — Cologix CGY1 (ID 17001)"
      ],
      "public_source_urls": [
        "https://www.cologix.com/data-centers/calgary/cgy1/",
        "https://www.peeringdb.com/fac/17001"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown permanent jobs"
      ],
      "map_url": "/?project=cologix-cgy1"
    },
    {
      "id": "capital-power-alberta-mou",
      "name": "Capital Power Alberta Data Centre MOU",
      "location": "Alberta — site not publicly confirmed",
      "municipality": "Alberta (unknown)",
      "latitude": 53.5,
      "longitude": -113.5,
      "location_approximate": true,
      "status": "MOU / Early Agreement",
      "workload_type": "Mixed / Unknown",
      "source_status": "Source-listed",
      "purpose": "Binding electricity supply agreement MOU with an unnamed investment-grade data-centre developer for a possible Alberta data-centre load. Site not publicly confirmed.",
      "power_mw": 250,
      "power_label": null,
      "water_source": "Unknown",
      "cooling_method": "Unknown",
      "permanent_jobs": null,
      "construction_jobs": null,
      "developer": "Investment-grade data-centre developer (identity not publicly confirmed)",
      "operator": null,
      "end_user": "Unknown",
      "project_cost_cad": null,
      "expected_operational_date": "2028 (anticipated commencement of ESA, if MOU finalized)",
      "last_updated": "2026-06-10",
      "public_sources_count": 1,
      "public_source_names": [
        "Capital Power — 2025 Investor Day: Powering AI in Alberta"
      ],
      "public_source_urls": [
        "https://www.capitalpower.com/investors/"
      ],
      "data_gaps": [
        "Unknown water source",
        "Unknown cooling method",
        "Unknown permanent jobs",
        "Approximate location"
      ],
      "map_url": "/?project=capital-power-alberta-mou"
    }
  ]
}